Friday, November 18, 2016

My Bags over the last 2 months #elmstreetquiltsbagit

I've been making a lot of bags over the last two months, so I thought I would share them for the

#elmstreetquiltsbagit 

event. Elm Street Quilts Bag It Event is going on right now.
I made 3 Becca Bags from scraps of Remington fabric and camo fabric. These will be Christmas gifts.
Three more bags finished last night for gifts.

These purple/teal baskets/bags are great for giving as small gifts.
Four baskets finished tonight! One of my older UFOs.
This one holds all my "stuff" at work.
Basket if charms

I made two of these Becca bags from leftover quilted material. Both use the 1 zipper technique.
Finished up this Becca bag tonight.
These five sweet pea pods were made from scraps of Bendy bags.
Five sweetpea pods done. Only 7 left!
I made up these three clear project bags for my WIP's to go in.
Three more project bags completed.
I made two bottle bags. This is the medium.
Essential oil bag made with wine fabric scraps.
This is the inside of the small one. They hold essential oils.
Inside of bag.
I also made myself a new purse. I just love the horse fabric.
20160920_075247

Friday, November 04, 2016

November OMG Goal

November is already flying by. I'm not sure why I think I have time to start 3 new quilts, but I have pulled the fabrics and started the cutting process for three new ones. My goal for the November OMG party is to make the Fractions quilt top from Stripology Squared. If I get it quilted and bound that will be the icing on the cake, but right now I'm shooting for getting the top made as my goal.

Cutting out a Fraction quilt today with the Stripology ruler #gedesigns
My goal was supposed to be to make the Peek A Boo table runner in brown and blue batiks. However, I ended up getting it finished this morning, so I'll set a bit more challenging goal. I have another one I would like to make before next Saturday, but we'll see what happens.
Peek a Boo table runner made from blue batiks.

I'm linking up for November OMG at Elm Street Quilts.
Elm Street Quilts





Monday, October 31, 2016

October OMG finished!

October was a very successful sewing month for me as is usually the case. I just seem to finish up a lot of overdue projects. I finished 25 projects this month!
My OMG goal was to finish Strip Lash, which I was able to do before attending Gudrun's class at the retreat.
Strip Lash II finished!
I finished up the 4 blocks for FGV quilt along. I now have two more to work on. I'm loving this sew along because it is slow paced and I can sew other stuff too.
My 4 blocks for FGV finished just in time.  New blocks came out today.
I finished the 6th block for Gudrun's Dangerous BOM. I love this mystery!
The first 6 blocks of Dangerous BOM.
I finished up two All Bottled Up bags for gifts.
Essential oil bag made with wine fabric scraps.
I finished two purple Charm baskets. I have another 4 cut out! These will just not go away.
Basket if charms
I finished the Peek A Boo table runner for a class I plan to teach in January. I have two more cut out to show it in different styles.
Peek a Boo table runner. #gedesigns
Eight hours of testing this month gave me time to work on my EPP. I got 4.5 rows sewn together. Progress! This hand piecing project is going on 6 years.
Four hours of testing =4 1/2 rows sewn together. More progress than in the past year.
Yesterday I was able to quilt at dad's. I got Giant Starburst quilted.
Giant Starburst quilted.
I quilted Strip Burst and bound it last night for another finish.
Strip Burst finished in less than a month! #gedesigns
I quilted Strip to be Square and bound it last night.
Strip to be square, bound and ready for the camper. #gedesigns

The best part of the month was taking a class at a retreat with Gudrun Erla of GE Designs. She was one of my "bucket list" teachers I'd wanted to take a class from. I loved every minute of it!

A fun class with Gudrun Erla Gisladottir yesterday at the Quilting in the Hills retreat.



















The kids are loving the beautiful fall weather, so we take lots of pictures before school. Although for the next week it will be dark every morning when we leave at 7:20!
upload

October Stash Report
Fabric bought this month: 8 yards
Fabric bought this year: 84.5 yards
Fabric used this month: 34.5 yards
Fabric used this year: 224 yards
Net Fabric used this year: 139.5 yards!

Tuesday, October 25, 2016

Design Wall

This week has been especially successful in the sewing studio. I cleaned up, re-organized, and don't have any pressing deadlines, so I have been able to finish up a few odds and ends.
I made three project bags. I ran out when I was going to retreat a few weeks ago and I was mad I didn't have any made up. I had intended to give these away... two years ago, but that didn't happen, so I can use them now.
Three more project bags completed.
I'm really trying to finish up the sweetpea pods I have cut out from when I made bendy bags last fall. I finished 5 more this week. I think the 7-10 I still have left can all be done with navy thread, so I need to get that on and finish those up. These will probably end up as gifts.
Five sweetpea pods done. Only 7 left!
My friend Kim asked for a new coaster, so I made this purple one for her. We have the same love for purple. Super simple and quick, but well loved.
Coaster made for a former coworker in purples.
I made this giant starburst top from scraps. It's almost identical to the last one I made, but with different yellows. I made too many yellows this time, so I'll have to figure out a plan for them.
Finished the Giant GB Starburst top  tonight. Made with leftover scraps from the last one.
Today we have an accreditation visit for our full program we have that I assist with. I planned the lunch/reception and cleaned up the office. I also made my SDSU mouse pad from a leftover block. I had originally made it for a demo, except it was partially together (think 1 corner missing) and it got lost. I sewed up the corner and finished up the block, quilted and did the binding last night.
Yellow and blue granny square orphan block made into a table topper. We have our accreditation visit tomorrow,  so sewing decor relaxs me.
It looks super cute next to the table topper it was meant to be in. I made the one in the upper left-hand corner to replace the missing block. Oh well, no harm in having an extra block.
Scrappy granny square table topper.
Last night I started on the Peek-a-Boo table runner I am doing for a class in January. I always struggle when starting quilt as you go, but once I get going, it's easy. I made all the pieces and this morning I was up early with my little early riser, so I worked on this for 1/2 hour. Got the center started and I'll be ready to work on it when I get home tonight.
Started my Peek a Boo runner this morning.  Getting up an hour early fave me some extra time to sew. #gedesigns

Monday, October 03, 2016

Weekend of Sewing

This weekend we enjoyed some relaxing time at Hart Ranch Camping Resort. We also went to my dad's for the day on Saturday, so I got some quilting time. I quilted Strip Lash II.

Strip Lash II quilted
Quilted Good Night Irene
Good Night Irene in brights.
quilted this Maxine panel for Christmas and the Strip Lash III table runner.
Christmas gifts for coworkers.  Take your pick!
While in the camper I made this dog basket for my boss for Christmas.
Basket made for a Christmas gift tonight.
Then a basket for a co-worker for Christmas.
Chess basket for a coworker for Christmas.  Tried the curtain grommet handles and love them! Hopefully he'll put his chess pieces in it.
Then a basket for my daughters teacher for Christmas.
Camping basket for Mikaela's teacher for Christmas.
With the other scraps I made another small basket for ??... just to get it done. All in all a very good sewing weekend.
Mini dog basket for Christmas gift for a coworker.

I also took out the cutout purple baskets and started working on them. I was inspired to finish them up, even if it is as leaders/enders while making binding.

October One Monthly Goal

I've been completing monthly and weekly goals, but forgot to post them in August and September, so I'm getting back on track. The Strip Lash II quilt is my OMG for October. I finished the top last month and my goal is to get it bound yet this month. Gudrun is coming on Friday for a class and I'd really like to have it finished by then, so we'll see. I quilted it at my dad's on Saturday and I have the binding made at home, so with some luck, I hope to finish it yet tonight.

Strip Lash II quilted

Thursday, September 29, 2016

September Accomplishments

I keep thinking I didn't do much because I don't have many finishes, but I did quite a bit of sewing.
I finished the Good Night Irene top II as a baby quilt. I plan to get it quilted this weekend.
Goodnight Irene baby quilt made with 2 charm packs.
I finished the Dangerous BOM Block 5. I've loved this BOM so much that I love to do the block right away each month.
Dangerous BOM block 5.
I started working on my FGV blocks and screwed up the kettle block, trying to rush to get it sewn one morning before work.
20160909_094325
I ripped and finished it that evening.
20160910_214306
I have the first five blocks of the Dangerous BOM - all scraps, except for the white.
The first 5 Dangerous blocks for GE Designs BOM on her Facebook page. Lots of fun using up tiny scrap pieces.
I was getting antsy for a finish, so I made this Riviera bag. It was super easy and I was disappointed I had waited so long to make it. I love the purse!
20160920_075235
I'm taking a Gudrun Erla class next month, so I wanted to take a quilt to show her. I took out the extra blocks I had left and made a throw quilt with them. It's beautiful! I can't wait to quilt it this weekend.
The 2nd Strip Lash quilt top is done, unless I decide to make it a bit bigger.
I had a lot of white/light blue blocks left, so I whipped up a table runner as well. I might get it quilted this weekend too.
Strip Lash III, the last of the white hexies in a table runner.
I bought this fabric to make a raglan shirt to wear to the retreat. I love how it turned out.
Tonight I made myself a shirt to wear for retreat next week!  I love this fabric!
My college friend Angie wanted a drawstring backpack, so I found a pattern and this fun Wizard of Oz fabric, which is one of her favorites.
Backpack
This week I finished up the Autumn Star block. I love the FGV blocks.
20160929_082614
The best part of the month was meeting my blogging friend Rhoda Mejeur from Michigan. She was visiting the area and we were able to meet up and say hi in person.
20160917_103240
Mikaela is loving Kindergarten and we had a great trip to Spearfish Canyon last weekend.
We took lots of pictures today. She was having so much fun.

August Stash Report
Fabric bought this month: 8.75 yards
Fabric bought this year: 76.5 yards
Fabric used this month: 5.5 yards
Fabric used this year: 189.5 yards
Net Fabric used this year: 113 yards!

Darn! my numbers are going backward! I hope to have at least 3 big finishes in October, so I think my numbers will go back up.
Funny story... I had 16 green HST's that were 9.5" and I needed just a few more yellow ones to make the pattern again. I bought 1.5 yards of fabric to make more HST's to use up those blocks... Only I miscalculated and made 8 extra HST's! So now I have extras after trying to use up extras! I hope to finish that quilt top up next month as well. It's all laid out and ready to be sewn.