This past week has been crazy busy! I am so ready for October, so I can slow down.
Oh wait, no sure it will happen then either. I had a couple finishes from last week I wanted to share pictures of since the shower is over. My co-worker Jody's shower was on Sat. and I gave her this little diaper clutch. It's made with the leftover backing fabric from her baby quilt.
I finally finished my dad and Ann's wedding quilt. It will be given to them on Friday. I think it's my favorite quilt so far this year. Maybe in the last 2 years. I simply love how stunning it turned out.
I did the label on the embroidery machine. It turned out awesome! So glad I can still make that thing work like I want it to, when I want it to.
This is the baby quilt I made for Jody. It's a panel, but her baby room is farmyard, so I knew it was perfect!
She loved the baby quilt and I'm so happy I went with this one instead of the one I started for her. She's due Nov. 1, so we'll be overlapping maternity leaves by about 4 weeks.
Saturday night I needed some me time, so after Mikaela went to bed I loaded my blush quilt. It's the one I tried to quilt with the Aurifil thread on Tues. night and cussed it so much that I took it out and started over with my old standby KingTut/Bottomline combo. I was mad too since I had bought both pink and turquoise Aurifil to quilt it with and neither worked. Oh well, live and learn. It was one of those nights where I would say I'll finish this bobbin, then I'll finish the row, then oh I don't have much left to do, so I might as well finish since it is going so well. I love how it turned out!
Here's a close up of the quilting.
Sunday night I had Jen's quilt on the frame and ready to quilt. I quilted and tore and quilted and tore several times before I got it where I like the quilting on it. When it was done I loaded this baby quilt on it. I was just going to load, then just check thread, and pretty soon it was completely quilted! Good thing I did as I found out the baby shower is Sunday night. Last night after I worked late I put the binding on. I'm hoping to finish the handwork during class tonight, but we'll see how it goes.
My dad drives a grader, so that is the picture I took of the quilting. It's for his grandson. So with 4 yards of bamboo batting I was able to complete three quilts, the blush, Jen's, and the Cat quilt. I think they will all be great snugly quilts, well except for Jen's, but it will hang well. That's my plan and I'm sticking to it!
Saturday night we took Mikaela to get her first hair cut. She was so not interested in sitting still, so I had to hold her and try to keep her still. She now has bangs and looks like a little girl. The hairdresser Cathy was so good with her!
It's been a VERY productive week! I don't think this next week will be since we are going to my dad's tomorrow for the wedding on Friday. I'm hoping I can have the baby quilt done by Sunday's shower. Anything else is a plus this week!
Finished this week:
Dump Truck Quilt
Pink/Brown Friendship Quilts - DONE!
Buggy Barn Pink/Brown Extra Blocks -DONE!
Ongoing projects: (and progress this week on them)
Sign Language Diaper Clutch
Batik Scrappy Quilt - Sewed all the 2.5" squares to the corners, now to trim and press
Hugs & Kisses Batik quilt
Hugs & Kisses Scrappy Quilt
Quilts Needing Hand sewing on Binding Blush Quilt - quilted!
Cre8tive Swap w/ Jen - Quilted
Completed tops awaiting quilting:
Pink/Green Jungle Animal Baby Quilt - Need to make backing
Confetti Top - At the shop
Twisted Heart - At the shop
Merry Go Round - Needs backing made.
Mocha Meringue Wonder Blocks- borders on - backing made
Autumn Star Quilt - needs backing
New Projects:
No progress:
Ed's Crown Royal Quilt - Started sashing - Need to get a move on, he's getting married
Dilly Dally Baby Girl Quilt
Swoon - 2 Blocks done
This week's stats:
Completed projects -3
New projects -
Currently in progress - 4
Finished this year - 51, 12 Samples
I'm linking up for WIP Wednesday at Freshly Pieced!
No comments:
Post a Comment