Monday, September 09, 2013

Central States Fair Ribbons

This year I set a goal of having as many quilts in the Central States fair as I possibly could. I worked up until the night before to get them all ready and finished. I was bound and determined to show the nasty quilt lady that I could bring in more this year than I did last year.
This is my purple hand pieced star.
Quilt 2013-08-17 006
My lone star for Mathew
Quilt 2013-08-17 007
A panel baby quilt I made for Mathew
Quilt 2013-08-17 008
Hugs and Kisses from Scrappy Batkiks
Quilt 2013-08-17 009
The Owl panel baby quilt and Emilee's scrappy swap quilt
Quilt 2013-08-17 010
Poinsetta table toppers
Quilt 2013-08-17 011
Friendship Stars wall hanging
Quilt 2013-08-17 012
Scraps from Briar Rose table topper
Quilt 2013-08-17 013
Let it Snow Batik pillow
Quilt 2013-08-17 014
Mocha Meriengue Wonder Blocks, Briar Rose, Let it Snow Batik
Quilt 2013-08-17 015
Unity Wall Hanging
Quilt 2013-08-17 017
Happy Hour Farm Friends
Quilt 2013-08-17 018
Easy 4 Baby quilt
Quilt 2013-08-17 019
Blush Hexies
Quilt 2013-08-17 020
Thangles BOM
Quilt 2013-08-17 021
Pink Chevron, Race Cars
Quilt 2013-08-17 022
Hexie Diamond Wall Hanging
Quilt 2013-08-17 023
Beach Bag
Quilt 2013-08-17 025
Sewing Pants
Quilt 2013-08-17 026
Mikaela's Skirt
Quilt 2013-08-17 027
Mikaela's Dress
Quilt 2013-08-17 028
And Finally - My Christmas Purse that WON best in class and Judges Choice! I was so excited, since I hadn't planned to enter it, but did at the last minute.
Quilt 2013-08-17 029


September is off to a Great Sewing Start!

September is off to a great start. I set some lofty goals to kick my butt in gear and I feel like I am already doing really well on them.
While we were camping over Labor Day weekend I finished this Ahhhh, named reflection. The picture is supposed to be trees and sky reflecting in the water.
Untitled
I finished this Merry Go Round table topper that I will be teaching in December. I'm also thinking I'll make one in Christmas fabrics as it went together so well.
Untitled
My big lofty goal for this month was to put this wolf top together. I started with this much completed.
Untitled
I worked on it last week and got this far.
Untitled
On Sunday while the rest of the family slept, Mathew was wide awake, so he played with his Tonka truck and I worked on the wolf. I got the entire thing put together, but stopped with the pick dots. I just hated it, luckily hubby agreed, so he picked a different fat quarter out and now I can continue to work on it. I really like how it turned out. Applique pressing sheets are my friend right now! I am so tickled pick that I have gotten this far on it since it is my oldest UFO.
Untitled

Friday night I spent the evening sewing with Gaila, Emilee, and Tammy. I got so much accomplished! I made 2 more Swoon blocks, completing my Sept. goal to get them done.
Untitled

Untitled

I also pieced together this Central Park Happy Hour quilt. It's for a co-worker who gave me quite a number of things for Mikaela, so I wanted to give her a little something. She loves orange, so I think she'll like this. I'm also thinking I need to make her daughter something maybe a doll quilt to match or something. We'll see what I can come up with.
Untitled
Saturday night while the family watched the race, I loaded and quilted this one up. It's really not my style, but the quilting was perfect and I think the orange thread I used really made it pop. I have the binding on it and will work on it this week during breaks. I've pulled some scraps to do the Star Surround quilt a long and I'd really like to get it done yet this week. We'll see how much I can get accomplished. I have a lot of things pulled.
Untitled
I finished my last paper yesterday and today at lunch turned everything in and I am now just waiting for my grade. I don't foresee it being anything lower than an A, but I'm always nervous until all the grades are turned in. I am so looking forward to having 3 weeks off to get a lot of sewing done.

Saturday we met my dad in Keystone for the Holy Terror Days parade. He wanted to take Mikaela on a little trip, so they went up the boardwalk and look what he did... He put a quarter in the pony and let her ride. She loved it! We've always let her play, but with no money or movement. She thought Grandpa Hugh was the best. She wanted to ride again before we left, so we let her. She really caught on to picking up candy at the parade She's growing up so fast!
Untitled

Friday, September 06, 2013

Finish it Up Friday

This week turned out to be a bit more productive than I expected. It's finals week for my graduate class, so I didn't expect to do a lot of sewing.
Last week I worked on this sample for a class I am teaching. I was going to finish it in one evening, even checking how long it was taking me to sew it together. Then I realized I had failed to match up the seams correctly and it was completely off. So I did a bunch of ripping and left it.
Untitled
On Monday night after a long weekend of camping I was able to get it put together.
Untitled

I thought for sure I would get it quilted on Tuesday night, but I didn't have the right thread, so I bought thread Wed. night and got it quilted. I did some echo quilting on the hexies. I really like how it turned out. I put the binding on Wed. night and sewed it down during my pumping breaks on Thurs. & today. The color is more accurate in the pictures above, but I am so happy to have it done. It is supposed to have 4 fat quarters and background, but I added the 5th for binding as I liked the zigzag.

Untitled
This is the back.
Untitled
Tonight I am off to sew with my amazing friends. I can't wait to spend time catching up with them. Have a great weekend.

I'm linking up with Crazy Mom Quilts for Finish it Up Friday!

Thursday, September 05, 2013

September - A Lovely Year of Finishes


A Lovely Year of Finishes

This is the month I plan to get a lot accomplished on my UFO list. I will be done with my graduate class on Monday and then I can devote some time to finishing up a few lingering projects.  My goals for this month include making this Merry Go Round table topper for a class sample for a class I teach in December. I had a few errors and went back and ripped last week. Then we were camping all weekend, so nothing got done until Monday night when we got home.
Untitled

I was able to get it to quilt top stage. I didn't have the right thread, so I stopped and bought it last night. I should have this finished this week some time.
Untitled
My major goal is to finish my oldest UFO. This is a wolf for my husband I bought shortly after we were married - 5 years ago. I want to give it to him for Christmas, so I'll work on it after he goes to bed a bit each night. I started with this much done.
Untitled
Tuesday night I had this much done and last night I got a few more pieces of the beard done. I'm scared to quilt it, so I haven't put it together even though it is all cut out and just needs to be put together. I hope to get the top done this month, if I finish that will be a bonus.
Untitled

My other goals include:
1/4 of my Rubic Star - hand pieced
1 Swoon block
Central Park Happy Hour top
2 Ahhhh's
1 UFO

Wednesday, August 28, 2013

What am I work on this Wednesday??

This has been a busy week in the sewing studio! I found my groove and spent quite a bit of time sewing and quilting this week. Saturday I loaded and quilted this Autumn Visitors UFO. It was an unloved UFO the Sarcastic Quilter sent me a couple years ago. I love the fabric, but wasn't sure who it would go to, so it sat untouched. However we are going to a wedding next month and I needed a gift. I'm not sure if this will go to them or not, but that's what I'm planning to use as the gift. I'm just not sure of their tastes, so I'm kind of on the fence. I trimmed it up on Monday night and put the binding on. Last night I stitched it down by machine. Just wasn't feeling like hand sewing it down, too many other handwork projects going on right now.
Untitled
Saturday late night I loaded this Autumn Star quilt on the frame. I fully intended to quilt it, but the tension was off and I was really struggling, so I put it away and didn't touch it until Monday night when I got home from work. We had leftovers, so I had a chance to quilt it. I ended up adjusting my bobbin tension and then I was able to get it to an acceptable level. My top tension has been running between 1-2 for quite a while and you can only go so low, so I knew I needed to adjust the bobbin. Luckily the adjustments worked. I read online, but it didn't really help me to know which way to go. The backing on this one is pink batik. It's from the same piece I used to back mom's pink ribbon quilt back in 2009. So glad I was able to use up some of my stash.
Untitled
Here's a close up of the quilting. I used a variegated King Tut and pink Bottomline.
Untitled
Yesterday I got the email about getting our class samples in for photos next week and I realized I hadn't even made this sample. It's a new class I'm teaching in the next quarter. I just love these purple fabrics. I wish I could find something to make with the whole line. I worked on this for an hour last night and when I was doing more unpicking than necessary I quit. On something so simple I think the seams need to match better than I had them, so I am fixing a couple spots. This one is a bit of a challenge, but I think it will turn out cute in the end. It's made with 4 fat quarters. I just wish one of the many hexie rulers we have in the store would have worked to cut these out. I ended up using 2" hexie EPP's.
Untitled
Yesterday I finished #18 Ahhhh, Aunt Mollie's Umbrella. My goal for August was to finish 3 Ahhhh's, which I was thinking was really unrealistic considering all the other handwork I have been doing on other projects, but this one went together so fast I started another one.
Untitled

Today I finished up #12 O' Matt's Lantern. I realize I need some lighter fabrics in these, so I'm going to have to incorporate more next week when cut out a new bunch. I have 3 left to piece before I need to prep more. I started the 3rd one and with a wee bit of luck I should be able to finish it before the end of the month.
Untitled

We are off for a camping adventure over the long weekend, so I'm planning to take a few EPP projects to work on. If I get the hexie table topper done and quilted I'll have some binding to finish as well. This has been such a productive month. I hope to get as much done in Sept. when I am off school for 3 weeks!