Showing posts with label 100 Blocks 100 Days. Show all posts
Showing posts with label 100 Blocks 100 Days. Show all posts

Thursday, December 31, 2009

December Quilting Accomplishments

December was a very productive month for me! I was able to finish up most of my projects for which I am very greatful.
My goals for December included:
~ 2 Baby Quilts - DONE!
~3 Cloth Books - DONE!
~Crazy Eights Wall Hanging - DONE! & Tablerunner - Top DONE!
~Crown Royal Quilt - Almost DONE! - Should be quilted this afternoon.
~Figgy Pudding Quilt - DONE!
~Jenn's Wall Hanging
~One Block Wonder - DONE!
~Quilt Pink - DONE!

The only thing I didn't work on was Jenn's wall hanging, but she's not in a hurry for it, so I want to take my time and do a good job on it. The rest of the list makes me feel phenomenal to have gotten so much done. My guess is I'll hit 100 hours of quilting this afternoon. It's such a rush to hit 100 hours this month.

I completed the 100 Blocks in 100 Days, with a total of 300 blocks made. I think I was the sole survivor in counting. Jennifer guessed I would have 307, so she was the closest. I'll get something made and send it out to her in the new year as time permits.

My goals for January include a lap size boots quilt and a runaround bag from the Fast & Furious Book, both samples for the new store. Looking at my UFO list, I'm hoping to get a few more things taken off the list. I'll probably only finish a few things in Jan. but I'll just enjoy the next year and what gets done, gets done.

January Goals
Western Boots Quilt
Run-around Bag
Jenn's Wall Hanging



Friday, December 11, 2009

Figgy Pudding Happy Hour Blocks Done

Today is day 89 of 100 Blocks in 100 Days. I had a rather large gap in my block making, including not making any blocks in November, but what can I say?? I was quilting last month! Last night I finished up the 30 blocks I needed for my Happy Hour Figgy Pudding quilt. I fell in love with the "Snapshots" pattern in the Happy Hour book and most of my friends and I call this the Happy Hour quilt. I've made 3 quilts with this same pattern so far and I still love it. It's quick, it's easy, and it's contemporary. In about 1 hour total, over the course of 2 days, I had all the blocks made for the quilt. I hope to get them layed out this weekend and at least the top done.
I haven't decided what I'm doing for the border. I have several different options, so I suppose I'll decide once I get the top done. I'm kind of leaning toward the brown with teal snowflakes. The backing is the white with red and green splash on it. I also have some of the border fabric from the line and the brown/tea/red rustic one, but I'm hoping to make a purse out of those. I have some of the white snowflakes too, but somehow I just don't want to use that for the borders.
IMG_0421
I was supposed to teach a Memory Basics class last night, but because of the cold all the ladies cancelled. Instead Paul and I used my free night to do a little Christmas shopping. I have a feeling we'll be buying right up until the last minute. We just have a lot of things we need aren't sure on. We ended up buying one gift and waiting on all the others. I had bought a few gifts, but we still need more. I am invited to a gift wrapping party tonight which I'm really looking forward to! Each person brings three rolls of wrapping paper, tape, and scissors. The paper is to be elegant, traditional, and kid/fun, one roll of each. While we were out last night I got what I needed, so I'm ready for tonight. I have about 6 or 7 gifts to wrap, but I think it will be fun to hang out with the ladies and get my gifts wrapped. I only have one of the quilts completely done and ready to wrap, so I need to get busy.
My goals for this weekend are lofty, but we're staying home, so I think I can get a lot accomplished.
~ Quilt & Bind Tractor Quilt
~ Piece Top, Quilt, and Bind Figgy Pudding Quilt
~ Finish Blocks and Piece Top for Crown Royal Quilt
~ Quilt Jenn's Quilt


100 Blocks 100 Days ~ 251 Blocks/ Day 89

Thursday, October 15, 2009

Crown Royal Quilt Layout

The first Crown Royal Quilt is coming together. I made another 21 blocks tonight and then layed it out on the design wall. I think I'll do at least one more row to the right, but possibly 3 more rows depending on who claims it first and what size the recipient wants it.

IMG_0150
I started these about 3 years ago, just collecting the bags. Two years ago friends of my dad and brother gave me a hundred or so. Last year they gave me another 50 or so. I plan to make 4 quilts, but I'm not sure of the size they want them. I'm thinking three throws and a queen size.
IMG_0151
I saw a pattern, but completely reworked all the pieces to fit the size of my squares.

100 Blocks 100 Days ~ 176 Blocks/ Day 31

Wednesday, September 30, 2009

September Quilting Accomplishments

My September Goals Included:
Carters Speedway quilt - Quilt & Bind
Hannah's Barnyard Quilt - Quilt & Bind
Mason's Animal Wall hanging - Quilt & Bind
Zoo Animals baby quilt - Piece, Quilt & Bind

I didn't do so well on my goals. I did get the embroidery done on Carter and Hannah's quilts, but still need to quilt and bind them. My quilting machine was serviced this month, so I should be able to get them done soon. I won't say I'll get them done in Oct, because I have a lot going on! I did finish Mason's wall hanging and sent it to Nich this week. The zoo baby quilt didn't go anywhere, so I'll have to do that later.
I did accomplish a lot of things, they just weren't on my goals list.

Made Darlene's Vest
Finished Mason's Animals Wall Hanging
Embroidered Names on Hannah & Carter's quilt tops
Pattern Tested for a NEW book coming out in a few weeks - All in Pinks
All 85 blocks for a Koi One Block Wonder for my MIL in 4 days!
Designed pattern for Crown Royal quilts & started making blocks - my OLDEST UFO!
Made a Purse/Wonder Wallet/Checkbook cover for my MIL
Quilted my mom's 5 yard quilt

Also in September:
Congrats to my friend Amy and Joe on the birth of Jacob Paul!

Won two rulers 6x24 & 6x12 from C&T Publishing
Finished up Waun-a-Finish Summer Challenge 18 UFO's Completed 25 Start to Finish Projects
Attended the Hill City Outdoor Quilt Show - Lots of awesome vendors!
Started 100 Blocks in 100 Days in Prolific Online Quilters Group - 110 blocks in 17 days so far!
Found out I am going to Disney World October 27-31 for work! We are doing the leadership training at Disney Institute!
We bought a new CAR!

My October goals are slim because of my work trip:
Professional Tote for my trip
New purse/wonder wallet for trip
Thanksgiving Gobble Gobble wall hanging
Crown Royal Quilt - 1 top
One Block Wonder - top

I've made it to 600 posts! I love blogging and can't believe it's been almost 5 years ago that I started blogging. I was teaching high school and I had my students do it too. I don't think any continued, but at that time it was a really new medium to express yourself. I've learned so much and found some great friends. As in everything there are always some bad apples, but for the last 4 years I can't believe how many awesome people I've met on the internet. I have really enjoyed documenting my quilting and seeing how I've grown over the years.
Thanks to all my blog followers/friends! You are AWESOME!



100 Blocks 100 Days ~ 110 Blocks/ Day 17

Thursday, September 24, 2009

OBW - Day 4

I have come to the realization, that things without a deadline, do not get done! I have had this OBW cut out since May and when I didn't have deadlines for anything this week, I decided to work on it. I got all the blocks done in 4 day! It didn't take me long at all. Now I just need to work on the design wall and get it all situated, but this will have to be done when I have others to help me look at it. I finished up all the blocks last night, so it's ready to be put together. I feel like I accomplished so much this week.
The 100 Blocks/100 Days challenge, really challenged me to go outside my box and work on projects that I've had sitting around for months. Last night I pulled out the crown royal quilt bag. I have a bunch of the bags already cut and I have the fabric bought, but I don't have a pattern I want to use. I found a concept online I liked, but needed to make it a different size, so I set about making a sample last night. Paul helped me do the math and while it won't be a traditional sized block, it won't matter. It will mathmatically work. I had my fabric calculator out and he had his construction calculator and we were working out the measurements. I hope to get at least one top done and see what it looks like and then I'll go from there. I'd like to make 4 quilts for Christmas, but we'll have to see how it works out. Paul thought my idea was cool, so I think it's the best idea I've had so far to make these quilts.


100 Blocks 100 Days ~ 105 Blocks/ Day 11

Tuesday, September 15, 2009

100 Blocks in 100 Days

In our Prolific Online Quilters group we have started a challenge to do 100 blocks in 100 days. I have several quilts I want to get done for Christmas, but they all include blocks, something I don't really enjoy making. I like putting it all together and quilting and finishing better.
This week I'm working on a quilt that involves a lot of pieces in each block. I finally got all 24 blocks finished, but I still have the rest of the border blocks to do. So far I've done 19 blocks in 2 days, but that's not going to last the whole time. I'm very proud of this quilt since it's scrappy, strippy, and way out of my normal realm of quilting comfort. When I'm able to show pictures, I'll be proud to show it off.
Are you interested in the challenge? Join our POQ group and motivate yourself to sew each day/week. It's all about the encouragement of like minded quilters.