This has been an amazingly productive month for my EPP. I finished the borders on this quilt and am working on the hand quilting. If you consider working on it being it's in the frame. I'm too scared/nervous to actually start the quilting on it.
I did however finish this table topper. I ended up quilting it with the machine. I was ready to be done!
I started the Mystahhhhry over at Hillbilly Quilt Shop and have the first step done.
I'm done with step 2 too.
And step 3 is done.
Step 4 came out this week, which is to stitch the yellow triangles to the teal diamonds. I'm about a third of the way done with those.
I also worked a bit more on my diamond table runner. It's slow going, but at least I am working on it. I try to do a row a week, which helps with my motivation.
2 comments:
you really did get a lot done! a finish, tool =) that's awesome.
I love, love, love that blue quilt! And learning that's been EPP'd makes me love it even more! Is there a pattern for this or is this your own design?
Post a Comment