Showing posts with label Meandering. Show all posts
Showing posts with label Meandering. Show all posts

Sunday, September 26, 2010

Triple Finish Weekend!

If I thought Thursday night was productive, it was just the precurser to the weekend. Paul and I went out to the new Pizza Ranch for supper Friday night and I ate way too much and felt awful the rest of the night. I definately learned my lesson! Saturday we did our errands and mid afternoon I finally was able to load the teal and brown quilt. I can't remember the last time I've loaded a queen size quilt. I had the backing all ready and a wool batting that I had saved for it, so it didn't take me long to get it all loaded. I used teal/brown King Tut on top and brown Bottomline in the bobbin. This picture is the quilt hanging off the frame.
IMG_0644
I did a mid sized meader on it. I did speed up the machine a bit, so it went fairly fast, but still took me probably about 5 hours to get it quilted. I went through 5 bobbins and 1 spool of thread!
IMG_0646
I love how the thread looks on the fabric. It's all batiks and I just love how it turned out. It fits our bed perfectly, so I know we're going to love it this winter.
IMG_0647
When I got done quilting it Saturday night, it was still early, so I cut and made the binding for both this quilt as well as the zoo animal quilt I quilted the other night. I put the binding on the zoo animal quilt, so all I have is the handwork left.
IMG_0638
Today I put the binding on the brown/teal quilt and decided to clear off my cutting table so I could work on some other projects. I knew I had enough candy corn  fabric left to make another table topper. Since Oct. is sneaking up quickly, I decided to finish this one today instead of putting away the fabric. I made the top, put it on the frame, and quilted it today. I used orange/yellow King Tut and golden Bottomline.
IMG_0651
I was able to quilt it in about 15 minutes start to finish. I also put the binding on it tonight. While I was cutting the binding, I realized if I was a bit creative I could get another topper out of the scraps, including the backing, so I cut it all out and have it ready to be made. I need a few gifts in the next couple weeks, so I figure I'll have them made up and ready to go when I need them.
IMG_0652

This week I'll have plenty of handwork to keep me busy. I have the Halloween Table Topper, the Zoo Baby quilt, and the Queen size Brown and Teal quilt that all have binding that needs to be sewn down by hand. I feel so great that I was able to accomplish all of these things this weekend. In addition, I cleaned house, did laundry, and cooked! Paul's out of town for work this week, so I hope to get a lot accomplished in the evenings, since I do not have school or classes this week!

Wednesday, August 11, 2010

French Braid Quilted!

Last night could have been a very lazy night. It was hot and I was tired and I wanted nothing more than to lay on the couch and take a nap. I actually did for quite a while, but about 8 last night I realized I wanted to have this tablerunner to work on the binding during my appointment today, so I went to my studio.
I pieced the backing and loaded it on the frame. I used a thermore batting and cranked the tension up a bit. I quilted with Lime green King Tut on top and Lime Green Bottomline in the bobbin. I had planned to use orange, but when I put the lime green on it, I liked it better. The backing is the green with orange moons and purple houses, so the bobbin needed green.
I quickly quilted it, which in my world is great. I had to do 3 passes to finish it. It's about 13.5"x 48" so pretty long.
IMG_0301
I did a small meander all over, missing where the points meet up. It was pretty easy to manuver around them.
IMG_0302
Then I took the fat quarter of stripe and made bias binding. It turned out perfect and I didn't even get my book out. I'm getting beter and better at making this type of binding. I did run short though, by about 8 inches, so I took the end piece I had cut off and cut it on the bias and added it to my binding and it worked. A few more seams, but oh well, at least I didn't have to go buy more yardage.
IMG_0303
I love how the tablerunner turned out and I'm looking forward to teaching this class this fall. I love the 60* ruler and how easy it is to match up the points. The only part I don't like...not being able to piece it with my walking foot, but I'll live!

Thursday, July 30, 2009

5 & Dime Finished!

Today I officially finished the 5& Dime quilt I started Friday. I finished the binding last night and put the label on, so today at lunch I finished the hand sewing on the label. Since these are not my colors whatsoever... everyone who see's it can't believe I love how it turned out. I was racing Tammy at TSC to get it done and I won! She offered me her kids... said she'd get more done if I had kids and she didn't.
IMG_0123
The label was fussy cut from the center fabric and fused on.
IMG_0127
A little closer up of the quilting. I did a rather large meander which worked really well and turned out super nice. I did the olive green on top and teal in the bobbin. It's really hard for me to even believe that I'm digging the green in this quilt. I've come out of my purple box... It's been a long time since I've done anything that is purple.
IMG_0128