Showing posts with label Patchwork Jungle. Show all posts
Showing posts with label Patchwork Jungle. Show all posts

Sunday, December 14, 2008

Patchwork Jungle

We didn't get the big blizzard they were predicting, but we did get the frigid cold temperatures. Yesterday it was -9 when I got up. I worked and we had a total of 3 customers all day. It was too cold to be out. Paul's pickup wouldn't even start.
I finished hand sewing the binding on the Patchwork Jungle baby quilt yesterday. The kits are already done and I'm pleased with how the sample turned out. It took me about 6 hours to maket the top on Fri. night and 1 1/2 hours to quilt on Sat. night and another hour or so to put the bias binding on and about 2 hours to hand sew it down. I'm overall pleased with how quickly it went together and the way my colors worked.
004

Last night after work I made 60* table runners for my co-workers. I have a few left to go and then I need to quilt them all, so I'll be busy this week. We're having a Christmas gathering to reveal secret santa's on Wed. night and then I need two gifts by Fri. and another for Mon. I quilted my crazy eights table topper last night with a fairly small stipple. I used a mettler blue verigated that had a bit of shimmer to it. It turned out really well. The finished size is about 45" I did the bias binding and got it all put on. I'll finish sewing down the binding today during lunch.
009