I set another goal to finish 1/4 of the Rubic Star. I have half of it done and have all the large sections pieced now, so I far surpassed that goal.
I forgot my stitching one day, so I worked on this one at work. It now has the 2nd row almost completely on. This is a slow project, but it is coming along nicely. I can't believe how much I finished in just a short day.
I started a couple new projects this month. I made 3 of the 4 blocks for the Star Surround quilt along. These are made of Frolic scraps and are turning out really cute. I hope to finish this top next month.
I also did a 32" Star Surround and finished it, start to finish. I also gifted it, but I'm going to do another post with all the quilts I gifted last week.
I finished this UFO - Central Park Happy Hour and it was gifted as well.
I made Mathew some cute shoes, which sadly do not fit. Baby gift for someone!
I spent time sewing with friends and finished 2 Swoon blocks. I only had 1 on my goal list.
I have 1 Swoon Block left to make.
I also made this sample for a class I am teaching in December.
I completed my goal to finish 2 Ahhhh's this month, but now I have no more ready to piece, so I need to prep a bunch for sewing.
All in all September was a very busy month moving my dad and travelling to MN for a wedding, so I feel great getting 90 hours of sewing time in. A lot of hand sewing was done! I'm looking forward to getting back to my machine and using my new to me cutting table. My October goals include:
Mom's Pink Ribbon Quilt UFO Top
Giveaway Bag
High Chair Sample
Pink/Purple Sample Quilt
Rubic Star Center
Swoon Block
Star Surround Top
I'm linking up for Fresh Sewing Day!

You have some fantastic projects on the go!
ReplyDeleteYour wolf appliqué quilt is amazing! Great work on everything! I love the black star surrounds, too!
ReplyDelete